HYDRO PROJECT EXPLORER

ETALIN / EXPLORER

3,097 MWCapacity as labelled in DPR
TWO LIMBS. ONE PROJECT ENVIRONMENT.

Explore the Etalin project.

Start at either dam axis, follow the corridors, or inspect the supporting infrastructure.

PROJECT KEY PLAN
Dri · Tangon · Powerhouse
N
Illustrative terrain · Local drawing grid · No verified elevation model
8 viewpoints
Drag to orbit · Scroll to zoom · Right-drag to pan
Assembling the site…Loading terrain, structures and source-linked assets.
SOURCE DRAWING LIBRARY

Infrastructure layout plan

Source engineering drawing
Download original PDF ↓PDF page 1 of 18Source status and notes remain those printed on the original drawing. Use the original PDF for fine engineering review.
WEBSITE EDITION · MODEL DEFINITION

What this environment represents.

A navigable, drawing-linked site massing prototype for the Etalin scheme. It is not the finished dam model, a hydraulic simulation or an operational digital twin.

SOURCE-DERIVED

What the file establishes

The project title and 3,097 MW label; Dri and Tangon dam axes; the powerhouse area; HRT, surge and tailrace labels; road and bridge layouts; muck-yard sheets; and a typical retaining-wall detail.

River footprints were extracted from page 1. Asset anchors and main route centerlines were manually interpreted. Muck-yard figures are transcribed as printed.

ILLUSTRATIVE

What is not a measured design

All terrain heights, structure masses, subsurface profiles, tunnel display thicknesses, yard volumes, building shapes and simplified road widths. The scene is not georeferenced. Terrain was not reconstructed from surveyed contours.

Dam blocks deliberately omit spillway bays, gates and generating equipment rather than invent those configurations.

Inputs required for the complete engineering-led environment

01Terrain & coordinatesCAD / GIS layouts, coordinate system and datum, terrain survey / DEM, imagery and approved boundaries.
02Both dam complexesGeneral arrangements, plans and sections; crest and foundation levels; spillways, outlets, gates, intakes and diversion structures.
03Water conductor systemsHRT / penstock plans and profiles, bore configuration, surge shafts / chambers, elevations and tailrace outlets.
04Powerhouse & plantCavern and building sections, generating units, turbine-generator geometry, cranes, transformers, electrical / switchyard layout.
05Project infrastructureValidated road / bridge profiles, muck-yard boundaries and final levels, facility layouts and approved rehabilitation plans.
06Interactive behaviourApproved operating sequences, training goals, construction schedule and hydraulic datasets where numerical simulation is requested.
Source quantities need review, not silent correction.

For DMD-5 and DMD-6, the printed average length × average sectional area does not match the printed capacity. Figures remain unchanged and flagged. Page 15 reports TMD-7 and TMD-8 together; that combined capacity must not be counted twice.

No external Etalin project facts, live data feeds, regulatory status, site measurements or operational claims have been added. VR and headset controls are not implemented or tested in this version.

ETALIN MAP EXPLORER

Your way around the project.

Choose an asset in the navigator or on the map to see its source drawing and available project information.

Explore in 3D

Drag to orbit. Scroll to zoom. Right-drag or Shift-drag to pan. On touch screens, pinch to zoom and use two fingers to pan.

Read the project map

Switch to Drawing map to explore the original overall layout. Drag to pan, use + / − to zoom and click the numbered markers.

See below the terrain

Underground view fades the terrain to expose interpreted water-conductor corridors. Use the layer switches to isolate assets.

Share a viewpoint

Copy view link saves the current camera, mode and selected asset in the URL. Access follows the website’s sharing settings.

Keyboard: arrows / WASD to pan · + / − to zoom · Home to reset · Escape to close a dialog

The layout is drawing-linked. Terrain heights and 3D structures are illustrative, with no verified engineering dimensions.